Industrial Projects
K.N. Toosi University, Tehran, Iran
Developing BIM-based facility management system for buildings using augmented reality. (2018 to Now)
National Iranian Gas Company, Tehran, Iran
Enhancing simulation models to estimate the impact of different delaying factors on gas pipeline construction, in Collaboration with Tecnosa R&D center (2018 to Now).
TECNOSA R&D center, University of Tehran, Tehran, Iran
Collaborating in development of a simulation-based scheduling system for layout optimization and effective resource allocation of module assembly yard (2016 to Now)
University of Alberta, AB., Canada
Developing a fuzzy discrete event simulation engine (2009 to 2014)
Developing a fuzzy Monte Carlo simulation engine (2007 to 2009)
Aecon Group Inc., AB., Canada
Developing a discrete event simulation model for scheduling modules for module assembly yard (2014)
Identifying and ranking influencing factors on labor productivity of various activities in module assembly yard (2013)
Developing data-driven fuzzy rule-based systems for predicting labor productivity of various activities in module assembly yard based on different influencing factors (2013)
Lockerbie and Hole, Edmonton, AB
Developing a simulation model for scheduling spools in fabrication shop (2009)