- Ya. Alipouri, M.H. Sebt, A. Ardeshir, W.T. Chan, “Solving the FS-RCPSP with hyper-heuristics: a policy driven approach”, Journal of the Operational Research Society, (2018), ISI.
-
- Ya. Alipouri, M.H. Sebt, A. Ardeshir, M.H. Fazel Zarandi, “A Mixed-Integer Linear Programming Model for Solving Fuzzy Stochastic Resource Constrained Project Scheduling Problem”, Operational Research: An International Journal, (2017), ISI.
-
- M.R. Afshar, Ya. Alipouri, M.H. Sebt, W.T. Chan, “A type-2 fuzzy set model for contractor prequalification”, Automation in construction, (2017), 84: pp.356-366, ISI.
-
- M H Sebt; M R Afshar; Ya. Alipouri. “Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem”, Engineering Optimization, (2016), ISI, DOI: 10.1080/0305215X.2016.1197610.
-
- A. Ardeshir, A.H. Khalilianpoor, Q. Bagheri, Ya. Alipouri, "Identify the most important parameters affecting the safety performance of mega projects in Iran's construction industry (Using Fuzzy Analytic Hierarchy Process)", Iran Occupational Health Journal (IOH), 2016, 13(2), pp. 17-28, [in Persian].
-
- H. Mostafaei, Ya. Alipouri. “A mixed-integer linear programming for scheduling a multi-product pipeline with dual purpose terminals”, Computational and Applied Mathematics, Springer, (2015), 34(3), pp.979-1007, ISI.
-
- H. Mostafaei, Ya. Alipouri, M. Zadahmad. “A mathematical model for scheduling of real-world tree-structured multi-product pipeline system”, Mathematical Methods of Operations Research, Springer, (2015), 81, pp. 53-81, ISI.
-
- M H Sebt; M R Afshar; Ya. Alipouri. “An efficient genetic algorithm for solving the multi-mode resource-constrained project scheduling problem based on random key based”, International Journal of Supply and Operations Management, (2015), 2(3), pp. 905-924.
-
- Ya. Alipouri, A. Ardeshir, M.H. Sebt, M.H. Fazel Zarandi, “A Fuzzy Expert System and Genetic Algorithms to Score the Safety Management Performance in Construction Sites of Iran: Considering Safety Climate and Personal Experience”, Sharif Journal of Science and Technology, (2015), 31-2(1) pp.31-39, [in Persian].
-
- M. H. Sebt, M. R. Afshar, Ya. Alipouri, “Solving a multi-mode resource-constrained project scheduling problem using genetic algorithm”, Sharif Journal of Science and Technology, (2015), 32-2(1), pp. 101-112, [in Persian].
-
- M. H. Sebt, M. R. Afshar, Ya. Alipouri, “An efficient meta-heuristic algorithm for project scheduling with multiple modes”, Journal of Civil Engineering (Ferdowsi Mashhad), (2015), 27(1), [in Persian].
-
- A. Ardeshir, Ya. Alipouri, P. Besmel, “Investigation of Factors Influencing Safety Performance of Workers in Construction Sites Using Fuzzy Analytic Hierarchy Process (Case Study: Khuzestan province), Iran occupational health journal (IOH), Feb-Mar 2015, 11(6), pp. 64-74 [in Persian].
-
- M H Sebt, Ya. Alipouri and Yo Alipouri. “Solving resource-constrained project scheduling problem with evolutionary programming”, Journal of the Operational Research Society, (2013), 64, pp. 1327-1335, ISI.
-
- Yo Alipouri, J Poshtan and Ya. Alipouri. “A modification to Classical Evolutionary Programming by shifting strategy parameters”, Applied Intelligence, (2013), 38(2), pp. 175-192, ISI.
-
- M H Sebt; M H Fazel Zarandi; Ya. Alipouri. “Genetic Algorithms to Solve Resource-Constrained Project Scheduling Problem with Variable Activity Durations”, International Journal of Civil Engineering, Transaction A: Civil Engineering, (2013), 11(3), pp. 189-198, ISI.
-
- Yo Alipouri, J Poshtan, Ya. Alipouri and M R Alipour. “Momentum Coefficient for Promoting Accuracy and Convergence Speed of Evolutionary Programming”, Applied Soft Computing, Elsevier, 12 (2012), pp 1765–1786, ISI.
-
- Ya. Alipouri, A. Ardeshir, M.H. Sebt, H. Vasheghani, “Identification of strategies for the improvement of human safety behavior in Iran by considering safety climate and personal experience”. Journal of Iranian Society of Civil Engineering (Asas), (2011), pp. 50-59 [in Persian].
|